Five-year's verification test results in Hokuto mega-solar system

Hiroo Konishi, Mitsuru Kudou, Hiroaki Miyata, Yuzuru Ueda

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

5 Citations (Scopus)

Abstract

The New Energy and Industrial Technology Development Organization (NEDO) advertised for consignment research business called "Verification of Grid Stabilization with Large-scale Photovoltaic Power Generation Systems" in 2006. Two sites were selected for the verification tests, which were Hokuto City in Yamanashi Prefecture and Wakkanai City in Hokkaido. Mega-solar system (Large-scale photovoltaic system) of about 2MW and about 5MW was constructed each. Five-year's verification test results of grid stabilization and PV characteristics evaluation in Hokuto mega-solar system are discussed in this paper.

Original languageEnglish
Title of host publicationProgram - 38th IEEE Photovoltaic Specialists Conference, PVSC 2012
Pages543-548
Number of pages6
DOIs
Publication statusPublished - 2012
Event38th IEEE Photovoltaic Specialists Conference, PVSC 2012 - Austin, TX, United States
Duration: 3 Jun 20128 Jun 2012

Publication series

NameConference Record of the IEEE Photovoltaic Specialists Conference
ISSN (Print)0160-8371

Conference

Conference38th IEEE Photovoltaic Specialists Conference, PVSC 2012
Country/TerritoryUnited States
CityAustin, TX
Period3/06/128/06/12

Keywords

  • EMC
  • PV characteristics
  • grid
  • photovoltaic systems
  • power conditioning
  • stabilization

Fingerprint

Dive into the research topics of 'Five-year's verification test results in Hokuto mega-solar system'. Together they form a unique fingerprint.

Cite this